After three weeks
of iterative improvement since the Missenden Weekend, I’ve more or less taken
this one-third of scale mock-up as far as I can go. This is the view over the railway and the Bristol Channel.
Tuesday, 29 March 2016
Monday, 7 March 2016
Pre-mock-up Mock-up
I’ve almost made a
mock-up.
Under the guidance
of Paul Bambrick at the Spring Railway Modellers Weekend at Missenden Abbey, I've
taken my first steps towards making the St Donats layout. There’s lots to do,
but I’ve now got something to look at, and here’s the first pic with “improvement
notes” to guide the next steps.
The one-third scale mock-up is 9”
deep and 12” wide. The “View Box” refers to the enclosing box with a cut-out to
frame the view, which will eventually be seen in a theatre-type presentation with
wings and a proscenium arch. The new frame height will be about
4.5” at mock-up scale.
Sunday, 24 January 2016
A break from the day job
I’ve taken out
a couple of days to get this blog going, and to explore ideas for the layout. I used Generate a Panorama (see Reference Sites) to try out various viewpoints as the basis for a backscene.
Friday, 29 May 2015
Hello World
This blog describes the creation of a model railway concept layout.
Subscribe to:
Posts (Atom)

