Friday 1 February 2019

Starting The Layout


Cannibalising an earlier layout, Kyle of Sutherland, is a quick way to achieve the basic framework and supporting structure for St Donats 1963.


The main scenic element is a 3 foot long diorama, with 2 foot 6 inch cassette tables at either end. The cassette tables can be turned around to allow operation from either front or rear. Here’s the start of work on the scenic board with the foreground track sub-base being tested for fit and position.

As soon as there’s some track, here’s a GWR 16xx loco ready to go. That is apart from brakes, sanding gear and some minor corrective surgery. And a slight re-alignment of the handrail.